0:00
Let's lay our black membrane down in our
0:03
poly tunnel. Welcome to Gardening with
0:05
Ben. And as you remember, I will been
0:09
digging and clearing out all my poly
0:11
tunnels. 16 years worth of rubbish
0:13
what's been in here since it's been
0:16
built. And yeah, we're starting a fresh
0:18
clearing it all down. We're leveling it
0:20
all out, digging it all over, getting
0:22
all the bindweed roots out, and starting
0:25
from scratch in here. starting with a
0:28
piece of land and yeah, starting a new
0:32
project and hopefully have some
0:34
fantastic things growing in here next
0:36
year down at the a lotment. So, let's
0:38
have a look at what we're doing today.
0:40
So, as you can see, I've dug it all over
0:42
now. So, we need to get the black
0:44
membrane back down to stop the weeds
0:46
from growing through all the poly
0:48
tunnel. So, we've purchased some brand
0:50
new black membrane. It's 4 meters by 10
0:55
meters, I think it is. So, it's bigger
0:57
than the poly tunnel. So, hopefully we
0:59
can go right up to the edges and keep
1:02
the weeds down as much as possible.
1:04
We've got all the pegs to fasten it down
1:06
with. And they come with these now. I
1:08
didn't used to have these on my old one.
1:10
You put the pegs through them. Uh so,
1:12
yeah, we got 100 of those. So, hopefully
1:15
it'll be well secured. So, yeah. First
1:18
up, we need to stamp down the edges so
1:20
that I can put the pegs in. So, we need
1:23
to go around and stamp it all down first
1:25
before we put the black membrane down.
1:28
So, I've been around and stamped all the
1:29
edges down. I want the black membrane to
1:31
go right up to the edge of the poly
1:33
tunnel so that we don't get hardly any
1:36
weeds growing in here this year. Fingers
1:39
crossed it works and we get it done. But
1:43
yeah, let's unwrap the black membrane
1:46
and get it in place. And there we are.
1:49
The flooring is in place. We just need
1:52
to sort those edges out and get some
1:55
more pins in. And then it's all complete
2:00
for the time being. That is, he says,
2:05
there's a lot more to come. Just you
2:07
wait. But yeah, let's sort those edges
2:11
out and get the rest of the pins in.
2:14
There we have it, all the flooring
2:22
But yeah, that is a job well done. I've
2:25
made sure that the edges go right up to
2:27
the edge to try and stop the weeds from
2:29
coming up through the sides. But we'll
2:31
see how we get on. We'll see. Hopefully,
2:34
fingers crossed, it's all right. We
2:36
might even tape them to the poly tunnel.
2:39
to stop any from coming out. But that's
2:41
another plan for another time. I'm just
2:44
happy that we've got it all completed
2:46
and all this done. It's been a tough
2:49
job, but we've managed to crack on and
2:52
do it. We still got some repairs to do
2:54
on the poly tunnel skin, but it should
2:57
hold for the time being.
3:00
But that's a job well done this weekend.
3:03
So, wow. We have got all the poly tunnel
3:06
done up to where I want it to be done
3:08
for the time being. There's going to be
3:10
some future improvements in a couple of
3:12
months, but you'll have to stay tuned
3:14
for them. So, make sure you do drop us a
3:16
follow and see what's our next plan for
3:19
this poly tunnel is. Uh it's going to be
3:22
exciting times and a whole new ball game
3:26
for inside this poly tunnel next year.
3:29
So, make sure you drop us a follow to
3:31
stay up to date with all our plans and
3:33
projects. Until next time everyone,
3:35
remember, keep smiling, keep shining,
3:37
and keep gardening with Ben.